Correct Answer: Prepare the zero-touch provisioning configuration in advance, rack and connect the new nodes to the network, and verify each node successfully joins the deployment and receives replicated policy from the PAN
Explanation: Proper zero-touch provisioning involves advance configuration, controlled connection, and verification of successful deployment join and policy replication, unlike skipping planning entirely, unnecessarily reconfiguring existing nodes, disabling the PAN, disconnecting existing PSNs, or skipping post-provisioning verification.
Correct Answer: Prepare the zero-touch provisioning configuration in advance, rack and connect the new nodes to the network, and verify each node successfully joins the deployment and receives replicated policy from the PAN
Explanation: Proper zero-touch provisioning involves advance configuration, controlled connection, and verification of successful deployment join and policy replication, unlike skipping planning entirely, unnecessarily reconfiguring existing nodes, disabling the PAN, disconnecting existing PSNs, or skipping post-provisioning verification.