CCNP Security 300-745 SDSI Practice Test 21

CCNP Security 300-745 SDSI Practice Test 21 (Hard) - Modifying Security Designs to Mitigate Risk

CISCO CCNP Security Exam Logo

1 / 10

Which principle should most directly guide a design team's selection of a specific mitigation approach after a risk has been identified and assessed?

2 / 10

Which risk treatment strategy involves formally accepting a residual risk after mitigation, rather than continuing to invest in additional controls, because the remaining risk falls within the organization's defined risk tolerance?

3 / 10

Which design practice would most help ensure that a proposed mitigation for an identified risk does not introduce new, unintended risks of its own (such as a new attack surface or operational fragility)?

4 / 10

Which risk would most likely result from a design team selecting a mitigation control based solely on compliance checklist requirements without independently validating that the control actually addresses the organization's specific identified risk?

5 / 10

Which factor would most influence whether a design team chooses to mitigate, transfer, avoid, or accept a specific identified risk?

6 / 10

Which combination of practices would provide an effective, well-governed approach to modifying a security design to mitigate an identified risk?

7 / 10

Which troubleshooting/process review step would be appropriate if a newly deployed risk mitigation control is found, during a subsequent review, to have introduced significant operational fragility (such as frequent false-positive blocking of legitimate traffic)?

8 / 10

Which statement accurately describes why risk mitigation is generally approached as a proportionate, risk-informed decision rather than a blanket policy of always applying the strongest available control to every identified risk?

9 / 10

Which combination of practices would help a design team ensure that risk mitigation decisions remain appropriate as the organization's risk tolerance and threat landscape evolve over time?

10 / 10

Which design practice would most help a design team validate that a deployed risk mitigation control is actually functioning as intended on an ongoing basis, rather than assuming it remains effective indefinitely once implemented?